---
description: Detaillierte Informationen über Oracle Primavera Cloud zu Benutzerfreundlichkeit, Funktionen, Kosten, Vor- und Nachteilen aus verifizierten Nutzer-Erfahrungen. Lies Ratings & Bewertungen und entdecke ähnliche Tools dank Capterra Schweiz.
image: https://gdm-localsites-assets-gfprod.imgix.net/images/capterra/og_logo-e5a8c001ed0bd1bb922639230fcea71a.png?auto=format%2Cenhance%2Ccompress
title: Oracle Primavera Cloud Kosten, Erfahrungen & Bewertungen - Capterra Schweiz 2026
---

Breadcrumb: [Startseite](/) > [Baumanagement Software](/directory/30057/construction-management/software) > [Oracle Primavera Cloud](/software/181380/oracle-primavera)

# Oracle Primavera Cloud

Canonical: https://www.capterra.ch/software/181380/oracle-primavera

Seite: 1 / 9\
Weiter: [Nächste Seite](https://www.capterra.ch/software/181380/oracle-primavera?page=2)

> Oracle Primavera ist die leistungsstärkste, robusteste und nutzerfreundlichste Lösung für die Planung, Verwaltung und Durchführung von Projekten jeder Größe.
> 
> Bewertung: **4.4/5** von 182 Nutzern. Top bewertet für **Weiterempfehlungsquote**.

-----

## Übersicht

### Wer verwendet Oracle Primavera Cloud?

Maschinenbau und Bauwesen.&#10;Energie und Ressourcen.&#10;Öffentlicher Sektor&#10;Herstellung

## Kurzstatistiken und Ratings

| Metrik | Bewertung | Detail |
| **Gesamt** | **4.4/5** | 182 Nutzerbewertungen |
| Bedienkomfort | 3.7/5 | Auf Basis der Gesamtbewertungen |
| Kundenbetreuung | 4.0/5 | Auf Basis der Gesamtbewertungen |
| Preis-Leistungs-Verhältnis | 4.0/5 | Auf Basis der Gesamtbewertungen |
| Funktionen | 4.4/5 | Auf Basis der Gesamtbewertungen |
| Empfehlungsprozentsatz | 80% | (8/10 Weiterempfehlungsquote) |

## Über den Anbieter

- **Unternehmen**: Oracle
- **Region**: Chicago, USA
- **Gegründet**: 1977

## Gewerblicher Kontext

- **Startpreis**: $ 100.00
- **Zielgruppe**: Selbstständig, 2–10, 11–50, 51–200, 201–500, 501–1'000, 1'001–5'000, 5'001–10'000, 10'000+
- **Bereitstellungen und Plattformen**: Cloud, SaaS, webbasiert, Windows (On-Premise), Linux (On-Premise)
- **Unterstützte Sprachen**: Chinesisch, Chinesisch (traditionell), Deutsch, Englisch, Französisch, Italienisch, Japanisch, Koreanisch, Niederländisch, Portugiesisch, Russisch, Spanisch
- **Verfügbare Länder**: Australien, Deutschland, Kanada, Vereinigte Staaten, Vereinigtes Königreich

## Funktionen

- Aufgabenmanagement
- Auftragsänderungsmanagement
- Budget Tracking
- Dashboard Software
- Dokumentenmanagement
- Fortschrittsbericht
- Fähigkeiten-Nachverfolgung
- Gantt-/Zeitstrahlansicht
- Gebot-Management
- Job-Planung
- Kapazitätsmanagement
- Kostenschätzung
- Mehrere Projekte
- Mitarbeiter-Kalender
- Mobiler Zugriff
- Priorisierung
- Projekt-Nachverfolgung
- Projektplanung
- Projektplanung
- Ressourcen-Planung
- Terminplanung
- Timesheet Management
- Werkzeuge zur Zusammenarbeit
- Zeitverfolgung

## Integrationen (6 insgesamt)

- Assignar
- Oracle Aconex
- Primavera Unifier
- Primavera Unifier Accelerator
- Reconstruct
- Zapier

## Optionen für Kundensupport

- FAQ/Forum
- Telefon-Support
- 24/7 Live-Support
- Chat

## Category

- [Baumanagement Software](https://www.capterra.ch/directory/30057/construction-management/software)

## Ähnliche Kategorien

- [Baumanagement Software](https://www.capterra.ch/directory/30057/construction-management/software)
- [Bauplanungssoftware](https://www.capterra.ch/directory/31522/construction-scheduling/software)
- [PPM-Software](https://www.capterra.ch/directory/30862/project-portfolio-management/software)
- [Immobilienmanagement Software](https://www.capterra.ch/directory/20050/real-estate-property-management/software)
- [Other Construction Software](https://www.capterra.ch/directory/34536/other-construction/software)

## Alternativen

1. [Procore](https://www.capterra.ch/software/56250/procore) — 4.5/5 (2680 reviews)
2. [Smartsheet](https://www.capterra.ch/software/79104/smartsheet) — 4.5/5 (3579 reviews)
3. [monday AI Workspace](https://www.capterra.ch/software/147657/monday-com) — 4.6/5 (6134 reviews)
4. [Buildertrend](https://www.capterra.ch/software/70092/buildertrend) — 4.5/5 (2489 reviews)
5. [Visual Planning](https://www.capterra.ch/software/91852/visual-planning) — 4.5/5 (128 reviews)

## Nutzerbewertungen

### "Market leader scheduling and planning software" — 5.0/5

> **Amjad** | *23. Oktober 2019* | Maritime Wirtschaft | Empfehlungsbewertung: 8.0/10
> 
> **Vorteile**: - has everything required for project scheduling using critical path method (WBS, activities, cost and resource loading)&#10;- Global change offers an unbelievably powerful solution to change thousands of activities on the fly.&#10;- Can handle very large schedules that include tens of thousands of activities at ease.&#10;- Works using databases rather than project files which makes it suitable for working on many projects and offers many types of databases (Oracle, SQL server, SQLite)&#10;- supports single or multiple users&#10;- now has the EPPM version which is cloud-based and has improved immensely over the years
> 
> **Nachteile**: - It shines for large and complex projects, for smaller and simpler schedules it tends to be more cumbersome.&#10;- It requires a very good understanding of how the software and CPM work when analysing results. Otherwise; mistakes can be done easily&#10;- While powerfull, the reporting feature of the Pro version (Standalone) looks antiquated in comparison to the EPPM cloud version. &#10;- The standalone version has not received any important feature updates for years.&#10;- Lacks the seamless integration with MS Office that MS Project has&#10;- Requires IT assistance to migrate the database from one computer to another
> 
> It was my daily driver for years and despite the steep learning curve, it was an extremely capable tool.

-----

### "Excellent Project Tracking and Accounting Options are Effective." — 5.0/5

> **Hannah** | *11. Juli 2023* | Bau | Empfehlungsbewertung: 9.0/10
> 
> **Vorteile**: The support on various Accounting platform integration and the stability of it's Mobile Access is amazing and the project document management this Oracle solution is the best choice.
> 
> **Nachteile**: Easy customization of various features on this Oracle product and I never experienced any error using this software.
> 
> Effective tracking and project financial planning and risk management product with various responsive features and the permission management capability is great.

-----

### "Satisfactory" — 3.0/5

> **NIKHIL** | *17. Oktober 2017* | Biotechnologie | Empfehlungsbewertung: 7.0/10
> 
> **Vorteile**: I liked the P6 in particular as a Scheduling Software as it allows me to perform additional tasks which are unable on Microsoft Project. I like the part where you can bunch a group of activities to be performed by a particular resource using a unique identification code and it can be useful on big projects where a resource just needs to know his part in the overall schedule
> 
> **Nachteile**: I was not happy with the software for particularly smaller projects and since there are licensing fees associated with the product it does not make sense to use it for smaller projects. Microsoft Project is a pretty decent scheduling software on its own to carry out projects and it also saves us the trouble of training people on the new software
> 
> I was able to use the P6 software on multi million dollar projects and it played a great role in improving the efficiency of the work and keeping track of critical deliverables

-----

### "Project Scheduling Software that works" — 4.0/5

> **Muhammed Anshad** | *12. April 2020* | Bau | Empfehlungsbewertung: 8.0/10
> 
> **Vorteile**: Oracle Primavera P6 is one of the best Project Scheduling tool that works on Critical path Method. I like the following features the most&#10;- Vast integration capability with Web, EPPM, Primavera Mobile and other oracle tools&#10;- Ability to generate large amount of data especially in the form of spreadsheet&#10;- Fully functional Earned Value Management
> 
> **Nachteile**: The software UI is old style and the options are not properly organised. There are some software bugs that are still persistent and oracle has been very slow in debugging them.
> 
> No doubt, it's the best project scheduling tool that is available for construction industry till date. Overall I would prefer this software over any other similar software for its pros mentioned.

-----

### "Best tool to manage portfolio" — 5.0/5

> **Swapnil** | *1. Dezember 2023* | Öl & Energie | Empfehlungsbewertung: 9.0/10
> 
> **Vorteile**: There is a option to view n number of projects at a time with progress comparison
> 
> **Nachteile**: Initial loading takes a bot longer time.

-----

Seite: 1 / 9\
Weiter: [Nächste Seite](https://www.capterra.ch/software/181380/oracle-primavera?page=2)

## Links

- [Auf Capterra anzeigen](https://www.capterra.ch/software/181380/oracle-primavera)

## Diese Seite ist in den folgenden Sprachen verfügbar

| Sprache | URL |
| de | <https://www.capterra.com.de/software/181380/oracle-primavera> |
| de-AT | <https://www.capterra.at/software/181380/oracle-primavera> |
| de-CH | <https://www.capterra.ch/software/181380/oracle-primavera> |
| en | <https://www.capterra.com/p/145503/Oracle-Primavera/> |
| en-AE | <https://www.capterra.ae/software/181380/oracle-primavera> |
| en-AU | <https://www.capterra.com.au/software/181380/oracle-primavera> |
| en-CA | <https://www.capterra.ca/software/181380/oracle-primavera> |
| en-GB | <https://www.capterra.co.uk/software/181380/oracle-primavera> |
| en-IE | <https://www.capterra.ie/software/181380/oracle-primavera> |
| en-IL | <https://www.capterra.co.il/software/181380/oracle-primavera> |
| en-IN | <https://www.capterra.in/software/181380/oracle-primavera> |
| en-NZ | <https://www.capterra.co.nz/software/181380/oracle-primavera> |
| en-SG | <https://www.capterra.com.sg/software/181380/oracle-primavera> |
| en-ZA | <https://www.capterra.co.za/software/181380/oracle-primavera> |
| es | <https://www.capterra.es/software/181380/oracle-primavera> |
| es-AR | <https://www.capterra.com.ar/software/181380/oracle-primavera> |
| es-CL | <https://www.capterra.cl/software/181380/oracle-primavera> |
| es-CO | <https://www.capterra.co/software/181380/oracle-primavera> |
| es-CR | <https://www.capterra.co.cr/software/181380/oracle-primavera> |
| es-DO | <https://www.capterra.do/software/181380/oracle-primavera> |
| es-EC | <https://www.capterra.ec/software/181380/oracle-primavera> |
| es-MX | <https://www.capterra.mx/software/181380/oracle-primavera> |
| es-PA | <https://www.capterra.com.pa/software/181380/oracle-primavera> |
| es-PE | <https://www.capterra.pe/software/181380/oracle-primavera> |
| fr | <https://www.capterra.fr/software/181380/oracle-primavera> |
| fr-BE | <https://fr.capterra.be/software/181380/oracle-primavera> |
| fr-CA | <https://fr.capterra.ca/software/181380/oracle-primavera> |
| fr-LU | <https://www.capterra.lu/software/181380/oracle-primavera> |
| it | <https://www.capterra.it/software/181380/oracle-primavera> |
| nl | <https://www.capterra.nl/software/181380/oracle-primavera> |
| nl-BE | <https://www.capterra.be/software/181380/oracle-primavera> |
| pt | <https://www.capterra.com.br/software/181380/oracle-primavera> |
| pt-PT | <https://www.capterra.pt/software/181380/oracle-primavera> |
| sv | <https://www.capterra.se/software/181380/oracle-primavera> |

-----

## Strukturierte Daten

<script type="application/ld+json">
  {"@context":"https://schema.org","@graph":[{"name":null,"address":{"@type":"PostalAddress","addressLocality":null,"addressRegion":null,"postalCode":null,"streetAddress":null},"description":"Capterra hilft Millionen von Nutzern die richtige Software für ihr Unternehmen in der Schweiz zu finden – Vergleiche Tausende von Bewertungen & Ratings von top Softwareanwendungen.","email":"info@capterra.ch","url":"https://www.capterra.ch/","logo":"https://dm-localsites-assets-prod.imgix.net/images/capterra/logo-a9b3b18653bd44e574e5108c22ab4d3c.svg","@id":"https://www.capterra.ch/#organization","@type":"Organization","parentOrganization":"G2.com, Inc.","sameAs":["https://twitter.com/capterra","https://www.facebook.com/Capterra/","https://www.linkedin.com/company/capterra","https://www.instagram.com/capterra/","https://www.youtube.com/user/CapterraTV"]},{"name":"Oracle Primavera Cloud","description":"Die Software-Suite Oracle Primavera bietet leistungsstarke, robuste und nutzerfreundliche Cloud- und Vor-Ort-Anwendungen, um erfolgreiche Projekte, Programme und Portfolios weltweit zu priorisieren, zu planen, zu verwalten und zu liefern.\n\nVon der Projektplanung, Kosten- und Projektsteuerung, dem Portfolio- und Dokumentenmanagement über die Analyse bis hin zur Risikoanalyse ermöglicht es Oracle Primavera Bauherren, Ingenieuren und Projekteignern in vermögensintensiven Branchen, die Ergebnisse im gesamten Projektlebenszyklus zu verbessern.","image":"https://gdm-catalog-fmapi-prod.imgix.net/ProductScreenshot/435a05d1-defd-4a40-961f-594ebcb0f3cd.png","url":"https://www.capterra.ch/software/181380/oracle-primavera","@id":"https://www.capterra.ch/software/181380/oracle-primavera#software","@type":"SoftwareApplication","applicationCategory":"BusinessApplication","publisher":{"@id":"https://www.capterra.ch/#organization"},"aggregateRating":{"@type":"AggregateRating","bestRating":5,"ratingCount":182,"ratingValue":4.4},"offers":{"price":"100","@type":"Offer","priceCurrency":"USD"},"operatingSystem":"Cloud, Windows on premise, Linux on premise"},{"@id":"https://www.capterra.ch/software/181380/oracle-primavera#faqs","@type":"FAQPage","mainEntity":[{"name":"Was ist Oracle Primavera Cloud?","@type":"Question","acceptedAnswer":{"text":"Die Software-Suite Oracle Primavera bietet leistungsstarke, robuste und nutzerfreundliche Cloud- und Vor-Ort-Anwendungen, um erfolgreiche Projekte, Programme und Portfolios weltweit zu priorisieren, zu planen, zu verwalten und zu liefern.Von der Projektplanung, Kosten- und Projektsteuerung, dem Portfolio- und Dokumentenmanagement über die Analyse bis hin zur Risikoanalyse ermöglicht es Oracle Primavera Bauherren, Ingenieuren und Projekteignern in vermögensintensiven Branchen, die Ergebnisse im gesamten Projektlebenszyklus zu verbessern.","@type":"Answer"}},{"name":"Wer verwendet Oracle Primavera Cloud?","@type":"Question","acceptedAnswer":{"text":"Maschinenbau und Bauwesen.Energie und Ressourcen.Öffentlicher SektorHerstellung","@type":"Answer"}}]},{"@id":"https://www.capterra.ch/software/181380/oracle-primavera#breadcrumblist","@type":"BreadcrumbList","itemListElement":[{"name":"Startseite","position":1,"item":"/","@type":"ListItem"},{"name":"Baumanagement Software","position":2,"item":"/directory/30057/construction-management/software","@type":"ListItem"},{"name":"Oracle Primavera Cloud","position":3,"item":"/software/181380/oracle-primavera","@type":"ListItem"}]}]}
</script>
